Boiler location & clearances
Bathrooms
IMPORTANT:
Any switch or appliance control using mains electricity must not be able to be touched by a person using the bath or shower.
Electrical switches, fused spurs and socket outlets must not be situated in the bathroom.
A boiler fitted with a non-mechanical timer or with no timer can be installed in zone 2 or outside the shaded area.
A boiler with a mechanical timer or RF mechanical timer with a room thermostats must only be installed outside the shaded area.
Additional Residual Current Device (RCD) protection may be required.
Refer to IEE wiring regulations.




Social media