Wall preparation
The following diagrams show the wall mounting jigs which enable a simple and straight forward method of attaching the boiler to the wall surface. The new design wall mounting jig for the Greenstar i Junior and Greenstar Si is made from light-weight polycarbonate ABS plastic with steel cross members.
Greenstar i Junior and Greenstar Si boiler wall mounting jig

Greenstar CDi boiler wall mounting jig

Additional fixing points have been pre-drilled and a small integral spirit level make hanging a Worcester Greenstar i Junior or Greenstar Si boiler easier than ever.
The Greenstar CDi wall mounting jig has additional optional fixing points and provides improved engagement.
After fixing the jig to the wall, the appliance can be lifted onto the jig and the union connections tightened. The pipework can be routed behind the boiler without the need for an additional wall spacing frame.
Optional accessory (Greenstar i Junior and Greenstar Si boilers)
The vertical pre-piping assembly kit (7 716 192 570) comprises a set of pre-formed copper pipes and an electrical cross-bonding strip.


Social media