[Skip to main content] [Skip to secondary navigation] [Skip to accesskey list ]

Wall preparation

The following diagrams show the wall mounting jigs which enable a simple and straight forward method of attaching the boiler to the wall surface.

The wall mounting jig for the Greenstar CDi regular has additional optional fixing points and provides improved engagement.

After fixing the jig to the wall, the appliance can be lifted onto the jig and the union connections tightened. The pipework can be routed behind the boiler without the need for an additional wall spacing frame.

Image of wall preparation

Greenstar CDi Regular wall mounting jig

Greenstar Ri boilers come complete with a wall mounting bracket which enables a simple and straightforward method of attaching the boiler to the wall surface. After fixing to the wall, the flow, return and gas supply can be connected. The boiler also features levelling screws which allow the alignment to the wall to be adjusted in line with the wall finish. This is particularly useful on uneven walls and tiled surfaces.

Image of Greenstar Ri boiler - wall mounting bracket preparation

Greenstar Ri wall mounting bracket


Social media


Home | Find a boiler | Head office contacts | Sitemap | Accessibility |