Sealed primary systems

Worcester Greenstar Highflow CDi combis are supplied complete with all the necessary components to form a sealed primary system. Included are a pre-plumbed expansion vessel (12 litres), a pressure relief valve (set at 3bar), an automatic air vent and a pressure gauge.

The expansion vessel fitted to the appliance will accommodate differing system volumes, depending upon its initial charge pressure, and system pre-pressurisation. The table below shows the system volume that can be accommodated under different conditions. If it is found that the system volume exceeds that catered for by the expansion vessel fitted within the appliance, then an extra vessel should be added as close to the appliance as possible in the heating return pipe. Refer to BS 5449:1 and BS 6798:1 for further information.

Image of Highflow CDi system volume table

System filling and make-up

To comply with the Water Authority requirements, the system should be filled via a temporary hose connection to the mains cold water supply, with a double check valve assembly and a test point fitted to the mains water side of the temporary circuit. This is supplied within the boiler.

Valves and joints

It is very important that all valves and joints are able to sustain a working pressure of up to 3bar (45psi). Particular care should be exercised when fitting radiator valves and only those of high quality to BS 2767:10 should be used. All other valves and fittings should comply with BS 1010. Loss of water pressure from a sealed system will require continuous recharging with fresh water and consequential introduction of air. Air is highly corrosive and will considerably reduce life expectancy of radiators, pumps etc.

Plastic pipework

The use of plastic pipework is acceptable. However, some plastics are permeable to oxygen and must be avoided. Only pipework with a polymeric barrier should be used. Please note that the first 600mm of pipework connected to the boiler must be copper.