[Skip to main content] [Skip to secondary navigation] [Skip to accesskey list ]

Condensate pipework

  • Where a new or replacement boiler is being installed, access to an internal ‘gravity discharge’ point should be one of the factors considered in determining boiler location

  • The condensate pipe must be a minimum of 22mm dia. plastic pipe

  • The condensate pipe work must fall at least 50mm per metre towards the outlet and should take the shortest practicable route

  • Ensure there are no blockages in the pipe run

Social media


Home | Find a boiler | Head office contacts | Sitemap | Accessibility |