Wall preparation

The following diagrams show the wall mounting jigs which enable a simple and straight forward method of attaching the boiler to the wall surface.

The new design wall mounting jig for the Greenstar i System boiler is made from light-weight polycarbonate ABS plastic with steel cross members.

Additional fixing points have been pre-drilled and a small integral spirit level make hanging a Worcester Greenstar i System boiler easier than ever.

Having fixed the jig to the wall, with a lift of less than 28kg, a Greenstar i System appliance can be easily lifted by one man onto the jig and the union connections tightened.

The pipework can be routed behind the boiler without the need for an additional wall spacing frame.

Image of Wall mounting jig for Greenstar i System boiler
Image of wall preparation 30CDi system

The Greenstar 30CDi System boiler wall mounting jig has additional optional fixing points and provides improved engagement.

After fixing the jig to the wall , the appliance can be lifted onto the jig and the union connections tightened.

Optional accessory (Greenstar i Junior and Greenstar Si boilers)

The vertical pre-piping assembly kit (7 716 192 570) comprises a set of pre-formed copper pipes and an electrical cross-bonding strip.