Condensate pipework
Where a new or replacement boiler is being installed, access to an internal ‘gravity discharge’ point should be one of the factors considered in determining boiler location
The condensate pipe must be a minimum of 22mm dia. plastic pipe
The condensate pipe work must fall at least 50mm per metre towards the outlet and should take the shortest practicable route
Ensure there are no blockages in the pipe run