[Skip to main content] [Skip to secondary navigation] [Skip to accesskey list ]

How do I repressurise my Greenstar Highflow boiler?

How to repressurise your Greenstar Highflow boiler using a filling link



These repressurisation instructions apply to the following boilers only:

  • Greenstar Highflow 440
  • Greenstar Highflow 440CDi
  • Greenstar Highflow 550CDi

IMPORTANT: We recommend you read these instructions prior to repressurising your heating system

1) Ensure the power to the boiler is turned off and that the heating system is cool.

2) Remove the front panel of the boiler to access the filling link.

The panel is removed by pulling the top of the front panel forwards then lifting the panel off, as illustrated in this diagram.

Image of How to remove Highflow boiler front panel

3) Locate the filling link.

The filling link comprises two pipes and a flexible metal-armoured connection hose. These are located in the bottom left hand side of the boiler, as shown in the photograph below.

The hose is used to connect between the two pipes in order for the system to be re-pressurised.

Note that normally, when the filling link is not being used, the connection hose should be disconnected from the bottom pipe. The bottom pipe should have it’s protective cap fitted.

Image of Greenstar Highflow filling link Image of Diagram of filling link connection

4) Prepare the filling link for use.

Ensure the isolation valves on both ends of the filling link pipes are in the closed position.

Remove the protective cover on the bottom pipe, as shown in the photograph below.

Image of Greenstar Highflow boiler link with cover removed

5) Attach the bottom of the connection hose to the bottom pipe and make sure the connections at both ends are tight.

Image of Greenstar Highflow flexible pipe connected with isolators closed

6) Fill the heating system.

To allow water into the system open the two valves at either end of the filling link hose. Open one of the valves fully but to control the flow of water into the system open or shut the second valve gradually.

Image of Greenstar Highflow boiler with isolators open

7) Repressurise the heating system to between 1 and 1.5 bar on the boiler’s pressure gauge.

When the pressure has reached between 1 and 1.5 bar, fully close both of the isolation valves.

  • On the Greenstar Highflow 440 the pressure gauge is just above the filling loop

Image of Greenstar Highflow 440 boiler pressure gauge

  • On the Greenstar Highflow 440/550CDi the pressure gauge is on the boiler’s control panel

Image of Greenstar Highflow CDi pressure gauge

8) Close the isolation valves and then disconnect the filling link flexible hose from it’s bottom connection. Refit the protective cover to the end of the filling link’s bottom pipe.

9) Replace the front cover back onto the boiler.

The repressurisation process may need to be repeated if you bleed the radiators.

Return to Boiler repressurisation

Social media


Home | Find a boiler | Head office contacts | Sitemap | Accessibility |