[Skip to main content] [Skip to secondary navigation] [Skip to accesskey list ]

Siting of the heating and hot water distribution unit

Siting of the heating and hot water distribution unit

Installation clearances

A minimum of 600mm is required in front of the unit. The other sides can be blocked. A minimum of 25mm is required between the unit and other permanent installations e.g. walls, sinks, etc.

Image of Siting of the heating and hot water distribution unit

Social media


Home | Find a boiler | Head office contacts | Sitemap | Accessibility |